Product Introduction

Engineering intelligence builds better towers. CLEVERTOWER® delivers safe, reliable, and cost-efficient tower solutions through proven engineering experience and rational structural design.

CT-T-40-L-03F01
High Quality Galvanized Steel Telecom Three Legged Tube Tower for Cell Tower Antennas Communication Infrastructure
Type (Kind)

Telecom Three Legged Tube Tower

Height

10m – 60m (Customizable)

Surface Treatment

Hot-dip Galvanization (to ISO 1461 or ASTM A123)

Hoisting Method

Crane Hoisting / Manual Winch

Material

Q355B / Q235B / ASTM A572 / ASTM A36 Steel

Application

4G/5G Telecommunication, Radio & TV, Microwave

Product Name

Three Legged Tubular Communication Tower

Product Details

Product Specification Technical Details
Tower Type Telecom Three Legged Tube Tower
Material High-Strength Q355B Galvanized Steel
Column Connection Method Professional Flange Connection
Safety & Reliability Wind Load Resistance up to 160km/h & Seismic Grade 8
Design Standard TIA/EIA-222-G / BS8100 / EN 1993
Antenna Loading Designed for 6–12 Antenna Systems
Service Life 50+ Years under standard environment
Platform Options Single or Multiple Working Platforms available
Color Natural Silver or Painted (RAL System)
Vertical Deviation Less than 1/1000

Superior Hot-Dip Galvanization Protection

All structural components undergo a rigorous hot-dip galvanization process according to ISO 1461 and ASTM A123 standards. This industrial-grade surface treatment ensures a service life of over 50 years, effectively protecting the 5g cell tower against extreme weather conditions, high humidity, and coastal salt spray corrosion.

Advanced 5G Network Infrastructure Optimization

Specifically optimized for the rigorous demands of 5G deployment, this tower supports multiple high-frequency antenna systems and microwave dishes. Its stable geometry and minimal sway design ensure signal precision and consistent high-speed wireless coverage for modern telecommunication networks in both urban and rural environments.

Efficient Flange Connection & Rapid Assembly

Featuring professional flange connection methods and precision-drilled bolt holes, the tower components are designed for streamlined on-site assembly. This modular approach significantly reduces hoisting time, equipment rental costs, and manual labor requirements, making it a highly cost-effective solution for large-scale infrastructure projects.

Certified Safety & High Wind Load Resistance

Designed and tested to withstand wind speeds of up to 160km/h and seismic activity up to Grade 8, our towers prioritize absolute safety and reliability. Every structure is verified using PLS-Tower or equivalent professional software to ensure full compliance with TIA/EIA-222-G and international engineering safety standards.

Send Inquiry

滚动至顶部

Request a Quote

Please fill in the form below and our team will contact you within 24 hours.

Company/Country/Product/Quantity